• Mabledon Road – Tunbridge Wells

    Finlo Frank Group expertly restored a fire-damaged property in Tunbridge Wells. Their comprehensive efforts included meticulous removal of damaged sections, the installation of new kitchen and bathroom facilities, revitalization of interior spaces, replacement of timber sash windows, external brickwork restoration, essential roof repairs, and structural assessments.

Case Study

Finlo Frank Group undertook the formidable challenge of restoring a property in Tunbridge Wells that had experienced severe internal damage caused by a fire and smoke incident. This complex project required a holistic approach to not only return the property to its pre-damaged state but also elevate its functionality, aesthetics, and safety.

The restoration process began with the meticulous removal of all sections that had been damaged and affected by the fire, setting the stage for the extensive restoration that followed. This step ensured a clean canvas upon which to rebuild and restore.

To reinstate the property to its original state, Finlo Frank Group initiated a comprehensive set of improvements. The addition of new kitchen and bathroom facilities was executed with precision, featuring modern amenities and premium finishes to enhance the property’s functionality and visual appeal. Flooring and walls received careful attention to rejuvenate the interior, providing a fresh and inviting atmosphere.

Refurbishing stairs and cupboards was integral to the restoration, combining both practicality and aesthetics. All timber sash windows were replaced, not only contributing to the property’s curb appeal but also improving energy efficiency, insulation, and security.

The property’s external appearance received special care with a thorough cleaning and repointing of the brickwork, reviving the building’s facade and contributing to its overall appeal. Roof repairs were carried out to address any damage caused by the fire, ensuring the property’s structural integrity and protection from the elements.

A crucial element of the project included in-depth structural assessments to verify the property’s stability and long-term safety, ensuring it would stand strong and secure in Tunbridge Wells for years to come.

In summary, the restoration project led by Finlo Frank Group in Tunbridge Wells exemplifies their unwavering commitment to excellence and their ability to tackle challenging endeavors. Transforming a property that had suffered fire and smoke damage into a fully restored, functional, and safe space showcases their expertise and dedication to high-quality craftsmanship.

Before

  • NIC EIC approved contractor
  • ISO Comply accredited
  • Acclaim
  • Contructline
  • The Contractors Health and Safety Assessment Scheme